Sign Up

Sign Up to our social questions and Answers Engine to ask questions, answer people's questions, and connect with other people.

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Sorry, you do not have a permission to ask a question, You must login to ask question.

Share & grow the world's knowledge!

We want to connect the people who have knowledge to the people who need it, to bring together people with different perspectives so they can understand each other better, and to empower everyone to share their knowledge.

Largest Civil Engineering Project in the World: Jubail II Industrial Area

Largest Civil Engineering Project in the World: Jubail II Industrial Area

Jubail 2 is considered by many to be the world’s largest civil engineering project.  It consists of an 83 km2 industrial development started in 2005 in the city of Jubail, 490 km northeast of Riyadh.

The current population of Jubail is 380,000.  The new development, when complete, is likely to double the size of the current city.  Jubail was a fishing village until 1975, at which time the first “Jubail Industrial City” was built.  At the turn of the century, the Kingdom of Saudi Arabia decided a big expansion was necessary.

Jubail Industrial Area

The project is being constructed in four phases over 22 years.  Phase 1 is already built and consists of eight blocks of industrial land.  Phases 2 and 3 include another 7 blocks, and various support industries and power facilities.  Phase 4 includes four blocks for aluminum and smelting industries.  The Kingdom is hoping to stimulate the mining industry.

The project requires 35 million cubic metres of earthmoving.  Also, to meet demand for coolant water in the industrial complex, 4.0 m diameter pipelines are being installed to serve the industries with seawater.

Both original and new Jubail 2 Industrial City are being designed and managed by Bechtel

A cost of $80 billion for infrastructure works only, Jubail II will be the largest civil engineering project of the world. Jubail Industrial II construction is a multi-billion dollar industrial city aiming to create social benefits and to strengthen the petrochemical industry. This project will double the size of the Jubail Industrial City by 6,200 hectares.

World’s Largest: Jubail II Construction
With more than 20,000 workers during its peak season and investing more than $4 billion in infrastructure, the area will be turned into a large industrial park, larger than what it is right now. The work encompasses miles and miles of roads, utilities, water, wastewater, and all required infrastructure. But that’s not all, at least $18 billion dollars are being designed to build the industrial city, extending from the existing industrial park to Kuwait-Ras Tanura corridor. The construction process is so large and wide that the project has been broken into four phases. Over 50,000 residential units will be added by 2026 as part of the expansion process. The RCJY has asked Bechtel, which handled Jubail 1, to manage Jubail II.

Jubail II Rail and Roads
The proposed transportation system consists of a six-lane highway between Jubail and Dammam. This highway is considered the main commercial area within the project creating a strong and efficient communication systems of all project components. Hundreds of roads and paths have been created leading to smaller towns and areas within the project. In total, more than 530 miles and 60 bridges were built during the construction phase.

The project has been carefully planned many decades ago and it has been developed taking into consideration and around massive oil lines that were installed years before the industrial development started construction. The total project cost can fluctuate even higher to accommodate changes and requests to expand its operations.

An Industrial City
Over 1,900 hectares will be developed during the process and a combination of tunnels, highways, and superstructures that will create an unobstructed path to development and the mining industry. The earthwork process will require to move more than 30 million cubic meters of aggregates, along with the installation of almost 16 feet diameter pipelines to carry water from the sea into the industrial facilities at a rate of 200,000 cu m per hour.

Another one of the amazing structures is the desalination plant that will process 800,000 cubic meters of water for cities in the Eastern Province, as well as generate 2,750 megawatts of electricity. The area also includes two large ports, built on an artificial harbor protected by 11 miles of breakwater. Bechtel acting on behalf of the managers of the project indicated that “The development also comprises a 5.6-mile-by-984-foot (9 kilometer-by-300 meter) causeway, with a four-berth open-sea tank terminal, a dry-bulk terminal with nine berths, a service quay, and a module-import facility―all built under contracts to the Saudi Ports Authority.”